• Home
  • About Us
  • Subscribe
  • Advertise
  • Newsroom
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • Current Issue
    • Latest News
    • Special Report
    • Up Close
    • Opinion
  • News by Sector
    • Real Estate & Construction
    • Banking & Finance
    • Health Care
    • Education & Talent
    • North Idaho
    • Technology
    • Manufacturing
    • Retail
    • Government
  • Roundups & Features
    • Calendar
    • People
    • Business Licenses
    • Q&A Profiles
    • Cranes & Elevators
    • Retrospective
    • Insights
    • Restaurants & Retail
  • Supplements & Magazines
    • Book of Lists
    • Building the INW
    • Market Fact Book
    • Economic Forecast
    • Best Places to Work
    • Partner Publications
  • E-Edition
  • Journal Events
    • Elevating the Conversation
    • Workforce Summit
    • Icons
    • Women in Leadership
    • Rising Stars
    • Best Places to Work
    • People of Influence
    • Business of the Year Awards
  • Podcasts
  • Sponsored
Home » Spokane Valley is short on funds for Sullivan Road bridge project

Spokane Valley is short on funds for Sullivan Road bridge project

Envisioned $20 million replacement not in state budget

June 6, 2013
Jessica Valencia

The city of Spokane Valley is facing a funding shortfall on a Sullivan Road Bridge renovation project that has been in the works for the last three years, says city spokeswoman Carolbelle Branch.

The Valley stands to lose $3.5 million in funding for the project if it doesn't go out to bid in November, Branch says, a looming reality if the matching funds it needs for the project aren't provided through Washington state legislative action.

Gov. Jay Inslee last month signed an $8.7 billion 2013-2015 state transportation budget that didn't include funding for the Sullivan Bridge project. However, the state still is considering a separate transportation package that would go toward road and bridge maintenance, and potentially could provide money for the project.

The Sullivan Bridge project, which includes replacing the existing southbound span over the Spokane River, currently is in the design phase and is expected to cost almost $20 million to complete. Of that, Branch says the city has secured preliminary commitments for $15.8 million. To proceed, the city is seeking the remaining roughly $4 million from the state.

The city has received preliminary commitments for funding from the Federal Highway Administration's federal bridge program, the Washington State Freight Mobility Strategic Investment Board, and the Washington Transportation Improvement Board. The city also has contributed $2.3 million in matching funds.

If the project doesn't go to bid on time this fall, it likely will lose $3.5 million of funding from the Washington TIB.

"It's really important to us that we continue to try and get that final piece of the puzzle," Branch says.

The current two-lane southbound bridge would be replaced with a four-lane bridge that would taper back to two lanes of traffic just north of the river. The project also is likely to include a 10-foot multiuse path located slightly below a six-foot walkway separated from the traffic by concrete barriers. The bridge also likely would include access to the river and nearby park.

The Federal Highway Administration deemed the bridge structurally deficient in 2010, meaning the bridge required significant maintenance, rehabilitation, or needs to be replaced.

The city made temporary repairs to the bridge in 2012, enabling it to lift weight restrictions that had been in place since the prior year.

    Latest News
    • Related Articles

      Pines Road project set for spring start

      Spokane Valley launches University Road overpass study

      Spokane Valley-based FlyBack Energy readies for launch

    Jessica Valencia

    CPA firm focuses on health care clients, keeps growing

    More from this author
    Daily News Updates

    Subscribe today to our free E-Newsletters!

    SUBSCRIBE

    Featured Poll

    What is Spokane's most iconic historic building?

    Popular Articles

    • Stephanie vigil web
      By Karina Elias

      Catching up with: former news anchor Stephanie Vigil

    • 40.13 fc art
      By Tina Sulzle

      $165 million development planned at CDA National Reserve

    • Binw davebusters (72) web
      By Journal of Business Staff

      Dave & Buster's to open Spokane Valley venue in August

    • Stcu ceo lindseymyhre web
      By Journal of Business Staff

      STCU names new president, CEO

    • Centennial lofts
      By Erica Bullock

      Large Spokane Valley residential project advances

    • News Content
      • News
      • Special Report
      • Up Close
      • Roundups & Features
      • Opinion
    • More Content
      • E-Edition
      • E-Mail Newsletters
      • Newsroom
      • Special Publications
      • Partner Publications
    • Customer Service
      • Editorial Calendar
      • Our Readers
      • Advertising
      • Subscriptions
      • Media Kit
    • Other Links
      • About Us
      • Contact Us
      • Journal Events
      • Privacy Policy
      • Tri-Cities Publications

    Journal of Business BBB Business Review allianceLogo.jpg CVC_Logo-1_small.jpg

    All content copyright ©  2025 by the Journal of Business and Northwest Business Press Inc. All rights reserved.

    Design, CMS, Hosting & Web Development :: ePublishing