• Home
  • About Us
  • Subscribe
  • Advertise
  • Newsroom
  • Sign In
  • Create Account
  • Sign Out
  • My Account
  • Current Issue
    • Latest News
    • Special Report
    • Up Close
    • Opinion
  • News by Sector
    • Real Estate & Construction
    • Banking & Finance
    • Health Care
    • Education & Talent
    • North Idaho
    • Technology
    • Manufacturing
    • Retail
    • Government
  • Roundups & Features
    • Calendar
    • People
    • Business Licenses
    • Q&A Profiles
    • Cranes & Elevators
    • Retrospective
    • Insights
    • Restaurants & Retail
  • Supplements & Magazines
    • Book of Lists
    • Building the INW
    • Market Fact Book
    • Economic Forecast
    • Best Places to Work
    • Partner Publications
  • E-Edition
  • Journal Events
    • Elevating the Conversation
    • Workforce Summit
    • Icons
    • Women in Leadership
    • Rising Stars
    • Best Places to Work
    • People of Influence
    • Business of the Year Awards
  • Podcasts
  • Sponsored
Home » Whitworth University to build engineering, physics building

Whitworth University to build engineering, physics building

Development is expected to be completed by late 2025

Whitworth3_web.jpg

Construction of the Paccar Engineering Center on the Whitworth University campus is expected to begin at the end of the spring semester. 

| Integrus Architecture PS
April 25, 2024
Karina Elias

Whitworth University expects break ground on a two-story, 21,500-square-foot engineering and physics building by late May, says Ryan Leone, project manager for the university. 

Spokane-based Bouten Construction Co. is the contractor on the project, and Integrus Architecture PS, of Spokane, designed it. The construction cost hasn't been finalized, but an early estimate lists the cost at $19 million. Grading and preliminary site preparation, including earthwork and footings, are set to begin in early May. 

"Construction could start as early as the end of the spring semester when students are gone," Leone says.

Dubbed the Paccar Engineering Center, the site for the structure is on the north end of the Whitworth campus, which is located at 300 W. Hawthorne Road. Paccar Inc., of Bellevue, Washington, a manufacturer of large commercial trucks, is the primary donor to the building with naming rights, Leone says. He declined to disclose the company's donation. 

According to site plans, the Paccar building will be flanked by three other science buildings, the Health Science Building, Robinson Science Hall, and the Eric Johnston Science Center.

The project is expected to take 17 months to complete and is expected to be wrapped up in December 2025, Leone says.

Kamesh Sankaran, professor and chair of the physics and engineering department, says the integrated engineering program is designed to provide graduates for emerging technologies.

To that end, Sankaran says the new Paccar Engineering Center will house an ISO 7 cleanroom to provide hands-on experience in semiconductor and photonics processes, faculty-student research labs for microdevices and microelectromechanical systems, prototyping and fabrication facilities, design studios, collaborative study spaces, an engineering graphics computer lab, and a classroom. 

"The facility will provide a venue for equipping our students to understand the fundamental principles of engineering, explore the boundaries of noble technologies, and create solutions to real-life problems for real clients," Sankaran says. 

According to preliminary site plans, the ground floor will occupy the metal fabrication shop, the ISO 7 cleanroom, an optics lab, experimental rooms, and study and meeting rooms. The second floor will house a 40-student classroom, a computational lab, design labs, and offices. 

    Latest News Special Report Real Estate & Construction Education & Talent Technology
    • Related Articles

      Whitworth to build new café, trades buildings

      Schweitzer Engineering Laboratories to improve power grid at Stanford University

      University of Phoenix plans to build facility here

    3ad05d77f20feb803d3db3a699fb8758
    Karina Elias

    Startup builds tool to streamline health care credentialing

    More from this author
    Daily News Updates

    Subscribe today to our free E-Newsletters!

    SUBSCRIBE

    Featured Poll

    How was the first half of the year for your business?

    Popular Articles

    • Stephanie vigil web
      By Karina Elias

      Catching up with: former news anchor Stephanie Vigil

    • 40.13 fc art
      By Tina Sulzle

      $165 million development planned at CDA National Reserve

    • Binw davebusters (72) web
      By Journal of Business Staff

      Dave & Buster's to open Spokane Valley venue in August

    • Stcu ceo lindseymyhre web
      By Journal of Business Staff

      STCU names new president, CEO

    • Centennial lofts
      By Erica Bullock

      Large Spokane Valley residential project advances

    • News Content
      • News
      • Special Report
      • Up Close
      • Roundups & Features
      • Opinion
    • More Content
      • E-Edition
      • E-Mail Newsletters
      • Newsroom
      • Special Publications
      • Partner Publications
    • Customer Service
      • Editorial Calendar
      • Our Readers
      • Advertising
      • Subscriptions
      • Media Kit
    • Other Links
      • About Us
      • Contact Us
      • Journal Events
      • Privacy Policy
      • Tri-Cities Publications

    Journal of Business BBB Business Review allianceLogo.jpg CVC_Logo-1_small.jpg

    All content copyright ©  2025 by the Journal of Business and Northwest Business Press Inc. All rights reserved.

    Design, CMS, Hosting & Web Development :: ePublishing